Large Reservoir Waterproofing Construction Plan
Large Reservoir Waterproofing Construction Plan
Update time:2024-11-02
Large Reservoir Waterproofing Construction Plan
The installation process for the composite geomembrane used in reservoir waterproofing consists of the following steps:
  • Foundation Preparation:
    Clear any debris, vegetation, or other foreign materials from the bottom and slopes of the reservoir. Ensure the foundation is smooth, clean, and free from sharp objects.

  • Geomembrane Installation:
    Lay the composite geomembrane according to the design specifications, ensuring it is flat, wrinkle-free, and without air pockets.

  • Geomembrane Welding:
    Use heat fusion welding or hot air welding methods to join adjacent geomembrane sheets, ensuring strong and leak-proof seams.

  • Geomembrane Anchoring:
    Fix the geomembrane in place using anchor trenches or fixing bands to prevent displacement or damage due to water flow, wind, or wave action.

  • Quality Inspection:
    Conduct a thorough quality inspection of the installed geomembrane, including visual checks and leak testing, to confirm that the waterproofing meets the required standards.